Home
About Us
Projects
Services
Clients
The People
News
Jobs
Contact Us

Prototype, Integration and Test

horizontal rule

The prototype, integration and test phase is where the previous engineering phases come together.   

The steps:

bulletPrinted circuit boards (PCBs) are fabricated, and assembled
bulletPreliminary hardware test using the lowest level of the firmware, commonly referred to as the hardware I/O layer
bulletHardware verification, Engineering Change Orders(ECOs), Documentation Updates 
bulletIntegration of higher layers of the firmware including  the 'toolkit' layer and 'application' layers
bulletRe-spin PCB layout and fabrication to incorporate ECOs
bulletTest PCBs - which may include preliminary agency (FCC, UL, etc.) testing where warranted

The deliverables:

bulletPrototype assembled PCBs
bulletUpdated Engineering documentation (PCB Artwork, Bill of Materials, Database, etc.)
bulletFirmware source
 
Copyright 2002-2014 Microprocessor Designs Inc
Last modified: June 13, 2016